Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2011/06/07
Orleans Conservation Commission                                 

Hearing Meeting Nauset Room                     June 7, 2011
8:30 a.m.       Call to Order   

Continuations
Last Heard May 17, 2011
Garner LeStage                                          12 LeStage Road
by Ryder & Wilcox, Inc. Assessor’s Map 50, Parcel 130.  The proposed removal of an existing dwelling, pumping and abandoning of an existing cesspool, the construction of a single family dwelling, the installation of a new septic system, and the grading and installation of a new driveway.  Work will occur within 100’ of the Top of a Coastal Bank and in the Pleasant Bay A.C.E.C..

Notice of Intent
William Hammatt                                         102 Skaket Beach Road
by J.C. Ellis Design Co., Inc. Assessor’s Map 24, Parcel 70.  The proposed upgrading of an existing septic system, abandonment of existing cesspool, and the partial replacement of an existing foundation.  Work will occur within 100’ of the Top of a Coastal Bank and the A.C.E.C.

Charles & Mary Longsworth                               8 Priscilla Road
by J.C. Ellis Design Co, Inc.  Assessor’s Map 22, Parcel 18.  The proposed upgrading of an existing septic system and abandonment of existing cesspools.  Work will occur within 100’ of the Edge of a Bordering Vegetated Wetland.

Amended Order of Conditions
Richard Stanton                                                 23 Herring Brook Way
by J.C. Ellis Design Co., Inc.  Assessor’s Map 55, Parcel 33.  The proposed septic system upgrade & water line relocation has been amended to include the construction of a deck, reconfiguration the septic plan, and mitigation landscaping. Work will occur within 100’ of a Salt Marsh, within Land Subject to Coastal Storm Flowage & the ACEC, & on a Coastal Bank.

Certificate of Compliance
Fred Hatch (2001)                                               9 High Street
The proposed request for a Certificate of Compliance for an Order of Conditions for the construction of a single family dwelling, grading, driveway construction, installation of a culvert, water line, and sewage disposal system.

Administrative Reviews
Priscilla Bloomfield & Ryan Smith                               51 Hopkins Lane
The proposed removal of an old garden fence, removal of old garden beds, and the reseeding of disturbed areas.  Work will occur within 100’ of the Edge of Wetland.  Work to be done by Nauset Landscapes.

Brian Kavanaugh                                         100 Freeman Lane
The proposed removal of existing greenhouse and replacement with a wooden roofed structure.  Work will occur within 50’ of the Top of a Coastal Bank.  

David Keefe                                                     124 Monument Road
The proposed removal of 1 locust, 2 live pines, 3 dead pines, a hanging limb from a Honey Locust, and the removal of existing asphalt, replacement with shell, and renourishment of existing shell driveway.  Work will occur within 100’ of Edge of Crystal Lake, Edge of Wetland, and the A.C.E.C.  Work to be done by A to Z Treez.

Colman W. Thacher                                               20 Snow Way
The proposed re-assembling of an existing stone wall.  Work will be done by hand and will also require some trimming of existing vegetation on the southern portion of the wall.  Work will occur within 100’ of the Edge of Wetland.  

Peter & Diane Sartori                                   30 Granny’s Lane
Proposed 15’ construction access for installation of a new septic system.  Construction access will be within 100’ of the Edge of a Bordering Vegetated Wetland.

Robert Barbarisi                                                4 Marshwind Lane
The proposed construction of an 8’ by 6’garden shed on pilings.  Work will occur within 100’ of the Edge of Salt Marsh and the Top of a Coastal Bank.

Joshua & Kathleen Larson                                        10 Academy Place
The proposed upgrade of an existing failed septic system.  The existing septic tank will be utilized, and the installation of a new pipe from the existing tank is the only work within the buffer zone.  All remaining components will be kept outside the 100’ buffer to the Top of the Coastal Bank.

Elizabeth Murphy                                                11 Windy Hill Lane
The proposed waterproofing of an existing foundation and installation of a drywell to connect existing downspouts.  The waterproofing of the foundation will occur within 50’ of the Edge of Wetland and the installation of the downspout will occur within the 100’ buffer of the Edge of Wetland.  Work to be done by Glenn Svenningsen.  

Mr. & Mrs. LeStage                                              12 Hayward Lane
The proposed removal of a dying pitch pine and installation of foundation plantings.  Work will occur within the A.C.E.C. and within 50’ of the Top of a Coastal Bank.  Work to be done by Wilkinson Ecological Design.

Chairman’s Business
Approval of the Minutes from the Work Meeting on May 24, 2011

Other Member’s Business

Administrator’s Business
The review of proposed facts, findings, and decision for the Denial Order of Conditions for 24 Beach Road.   

Report on Special Conditions and On-Going Conditions for Coastal Engineering Structures to be issued with the Order of Conditions for 111 Davis Road, and report from 5/27/11 on-site with Ryder & Wilcox.

Site Visits